Maintenance work order
WO-2026-0617
June 3, 2026 | High | Ready for review
Work requested
Replace leaking restroom faucet cartridge, inspect shutoff valve, confirm sink cabinet is dry, and return the room to service before the evening event setup.
Site, asset, and requester
Property: North Campus - Community Center
Location: Restroom 2B, first floor
Asset/equipment: Sink fixture SF-2B-04
Requester: Facilities coordinator
Access notes: Key at front desk. Work may start after 10:00 AM custodial cleaning. Place wet-floor sign before shutoff test.
Completion and signoff
Completion date: June 3, 2026
Technician lead: Maintenance technician
Completion notes: Replaced faucet cartridge, tested hot/cold flow, confirmed shutoff valve operation, dried cabinet floor, and reopened restroom. No follow-up leak observed after 15-minute check.
Requester signoff: Pending requester initials
Technician labor
| Role | Hours | Rate/cost note | Notes |
|---|---|---|---|
| Maintenance tech | 1.5 | Internal | Replaced faucet cartridge and tested fixture. |
| Facilities lead | 0.5 | Internal | Inspected cabinet and signed off reopening. |
Materials
| Material | Qty | Unit | Notes |
|---|---|---|---|
| Faucet cartridge | 1 | ea | Installed |
| Plumber tape | 1 | roll | Used at threaded connection |
| Wet-floor sign | 1 | ea | Placed during test |